Production

Two factories, one formula

Celomix is made in our Iran factory, and a second factory is under construction in the Sultanate of Oman to support projects around the Persian Gulf, in Africa and in Europe from closer by. Both factories work to the same formulas, the same laboratory and the same standard.

Iran factory · in production

Celomix Iran factory

Production runs on four specialised lines, each set up for one product line so that the mix of fibres, flakes and colour is repeated exactly in every batch. Project orders are scheduled into the production plan, and the most popular codes are always in stock and ready to ship.

Factory addressCity and industrial park — awaiting your information

Active since 2007
4Specialised production lines
[ … ]Tonnes a month — nominal capacity
[ … ]Thousand m² of wall a month
96Colour codes in production

Each kilogram of Celomix powder covers about 3 m² of smooth wall (about 2.5 m² on rough surfaces); the square-metre figure follows from the nominal capacity in the same way. Send us the factory's official capacity and it will be filled in.

Four production lines

Line 1 · Celomix Simple37 colours · even colour and fine fibres, the base of the Horizon family
Line 2 · Mica & Thread29 colours · mica flakes and coloured threads in the Horizon family
Line 3 · Semi-Silk and Micatex18 colours · the Bloom and Gem families
Line 4 · Silk12 colours · the Silken family, our most luxurious texture

This split of product lines between production lines is a proposal; send us the factory's actual setup and it will be corrected.

From raw materials to a bag ready to ship

  1. Sourcing and intakeFibre, silk, mica, pigment and binder, approved by the laboratory
  2. Weighing the formulaEvery colour code by the scale, not by eye
  3. MixingSamples taken during mixing for consistency
  4. Batch testA sample applied on a standard surface
  5. PackingExact weight and the batch number printed
  6. Warehouse and shippingDomestic and export

Oman factory · under construction

Celomix Oman factory

The second Celomix factory is being built in the Sultanate of Oman. Production in Oman will shorten delivery times to the Persian Gulf countries, make exports to Africa and Europe simpler, and bring the same colour batch closer to projects in the region.

LocationCity or free zone in Oman — awaiting your information

Under construction
  1. Decision and registrationCompany registered and Muscat office opened
  2. Land and permitsLand secured and industrial permits obtained
  3. Construction and fit-outBuilding the plant and installing the production line
  4. Trial productionTrial production and laboratory approval; date to be announced

These stages and dates are examples; send us the real status of the Oman project and it will be updated.

Close to the regional market

Faster shipping to the UAE, Qatar, Kuwait, Bahrain and Saudi Arabia, and closer support for projects.

Same formula, same colour

The formulas, reference samples and test methods are the same as in the Iran factory; every code is the same colour in both.

Gateway for export

Oman's ports shorten the export routes to East Africa, the Indian subcontinent and Europe.

Visits and partnership

Arrange a factory visit or a project order

Contact us